Escalante Solar Reaches Commercial Operation
Origis Energy and the Tri-State Generation and Transmission Association have put the 200 MW Escalante Solar project into commercial operation. The project was built on the site of the former 253 MW, coal-fired Escalante Station near Grants, N.M., which was retired in 2020. “Every time a project is completed and begins commercial operation, that is […]
The post Escalante Solar Reaches Commercial Operation appeared first on Solar Industry.