Catalyze to Head Operations at Finger Lakes Solar Sites
Catalyze says it will be heading operations at two Lancaster, N.Y., solar sites, totaling over 12 MW. The first site is a 6.63 MW community solar project with Finger Lakes Health as the anchor commercial utility off-taker. The second 6.06 MW site will offer remote net crediting, providing an additional opportunity for the off-takers. While […]
The post Catalyze to Head Operations at Finger Lakes Solar Sites appeared first on Solar Industry.