Enel Completes Solar, Storage System at Bayer California Facility
Enel North America and Bayer have announced the completion of a 2.7 MW solar and 1 MW energy storage system at Bayer’s vegetable research and development site in Woodland, Calif. The solar system is expected to generate approximately 5,100 MWh of renewable energy each year, enough to cover approximately 70% of the Woodland site’s energy […]
The post Enel Completes Solar, Storage System at Bayer California Facility appeared first on Solar Industry.