TEP to Build Tucson BESS
Tucson Electric Power (TEP) plans to build the 200 MW Roadrunner Reserve II, the company’s second large BESS, in southeast Tucson. The system, slated to store 800 MWh, is scheduled to begin operation in 2026, a year after the similarly sized Roadrunner Reserve is expected to begin operating on the same site. The side-by-side systems […]
The post TEP to Build Tucson BESS appeared first on Solar Industry.